Home / About

Why we built Seven Plus

Seven Plus takes its name from stage 7 of the RIBA Plan of Work: Use. It is the stage where a building is finally run – and where, too often, its asset information starts to go missing.

The idea

A resource gap at stage 7

Building managers are brought in at the very end. They are handed the operation and maintenance manuals and the building information, and told to run the building – with no continuity of knowledge from the stages before. Over time, asset information is lost or misconstrued. Seven Plus was built to close that gap.

The RIBA Plan of Work and Seven PlusStages 0 to 6 run from strategic definition to handover. Stage 7, Use, is where the building is run, and where Seven Plus keeps the asset information verified and current. 0Strategicdefinition1Preparationand briefing2Conceptdesign3Spatialcoordination4Technicaldesign5Manufacturingand construction6Handover 7+Use · Seven Plus Verified and current,for the life of the building The handover gap Design and construction teams hold the knowledge – then the project ends The building is run
What Seven Plus is

A product, with a service inside it

The product is the central record and the dashboard. The service is our team: going to each site to verify the assets, attaching SFG20 schedules and CIBSE Guide M expected lives, and keeping the record current every quarter.

Collect and verify

Asset data for new and existing buildings, gathered from what you hold and confirmed on site.

Enrich

SFG20 maintenance schedules and frequencies, CIBSE Guide M expected life, condition, impact and lifecycle cost.

Centralise

One central, protected resource that anyone authorised can understand – not a spreadsheet only one person can read.

Who delivers it

Larch Consulting, with BakerHicks

Seven Plus is delivered by Larch Consulting, a UK facilities management consultancy, with BakerHicks as engineering and surveying partner.

  • Facilities management expertise in asset data, planned maintenance, statutory compliance and estates operations
  • Engineering and surveying capability for site verification and condition surveys
  • £5 million professional indemnity insurance behind our work
  • Registered with the Information Commissioner's Office
An engineer verifying equipment on site

Book a 15-minute demonstration

See the Seven Plus dashboard working on a demonstration estate, and talk through what your buildings need.